Crusty's Pool Refurb

Tasks

14/43 complete · 4 in progress · 1 need decision

High priority Medium Low·Click a status badge to advance it. Costs and photos are shown on each card.

Replace pool pipes (spec upgraded)

Groundworks & Drainage

Notes: Pipework done. Drainage status to be evaluated on next site visit.

Finish: December 2025

Completed: 15 Dec 2025

Costs
Costs
Photos

Run drainage pipes in trenches

Groundworks & Drainage

Notes: In progress — evaluating plan.

Costs
Costs
Photos

Level terrace floor ready for resin

Floor Levelling

Finish: 24 Mar 2026

Completed: 24 Mar 2026

Costs
Costs
Photos

Level pool internal walls

Pool Internal Wall Levelling

Completed: 4 Apr 2026

Costs
Costs
Photos

Coping stones measured and ordered

Coping Stones

Notes: Changed from original edging tile spec. Estimated delivery ~2 weeks from 20 Feb 2026.

Finish: 28 Mar 2026

Completed: 28 Mar 2026

Costs
Costs
Photos

Fit coping stones

Coping Stones

Finish: 29 Mar 2026

Completed: 29 Mar 2026

Costs
Costs
Photos

Cut off corner of step

Coping Stones
Costs
Costs
Photos

Agree tile band colour with customer

Tile Band

Notes: Tile samples shared. Decision needed before ordering. See tile style reference: https://www.pooltile.com.au/product/cmc655-druid-grey-kit-kat-20mm/

Completed: 26 Feb 2026

Costs
Costs
Photos

Decide tile band height: 26mm or 38mm

Tile Band

Notes: Must not place tile band across the jet outlet face. Options: 26mm (above jets) or 38mm (below jets).

Completed: 26 Feb 2026

Costs
Costs
Photos

Order tile band tiles and epoxy adhesive (~€2,000 materials)

Tile Band

Notes: Installation included at no extra charge — avoids additional wall prep cost.

Completed: 4 Apr 2026

Costs
Costs
Photos

Fit tile band

Tile Band
Costs
Costs
Photos

Apply first coat render on garden walls

Wall Rendering & Painting

Notes: First coat complete ~24 Mar 2026. Final coat pending.

Finish: 24 Mar 2026

Costs
Costs
Photos

Paint surrounding walls

Wall Rendering & Painting
Costs
Costs
Photos

Trim tiles back or source suitable edging at wall junction

Wall Rendering & Painting

Completed: 4 Apr 2026

Costs
Costs
Photos

Build wall around pool room ventilation pipes

Wall Rendering & Painting
Costs
Costs
Photos

Prepare pool shell surface

Pool Shell Preparation & Refibre

Notes: Fibreglass preparation subcontracted to Fabian. Includes surface clean/degrease, sand and key, and crack/void repair. Cost included in pool respray quote S00973. Start date TBC.

Costs
Costs
Photos

Apply fibreglass lining (3 layers polyester resin + epoxy)

Pool Shell Preparation & Refibre

Notes: Apply three layers of polyester resin + epoxy fibreglass lining. Subcontracted to Fabian. Cost included in pool respray quote S00973. Start date TBC.

Costs
Costs
Photos

Apply EcoFinish aquaBRIGHT — French Grey (AB3-FG)

EcoFinish Pool Interior

Notes: Product in stock. Apply after coping stones fitted.

Costs
Costs
Photos

Apply terrace resin aggregate finish

Terrace Resin

Notes: Resin ordered — expected delivery end of March 2026.

Costs
Costs
Photos

Paint gate

Smaller & Additional Jobs
Costs
Costs
Photos

Install shower (supply and fit)

Smaller & Additional Jobs

Notes: Shower cancelled — no longer required. Quote S01227-E superseded.

Finish: December 2025

Completed: 20 Dec 2025

Costs
Costs
Photos

Hot tub electrical installation — supply, fuse box and connections

Smaller & Additional Jobs

Notes: Hot tub to go next to pool heater once resin is down.

Costs
Costs
Photos

Dig channel from pump room to heater enclosure

Smaller & Additional Jobs

Notes: Channel dug approx 24 Mar 2026. Large enough for drainage, water and electrical duct.

Finish: 24 Mar 2026

Completed: 24 Mar 2026

Costs
Costs
Photos

Install drainage, water pipe and electrical duct in channel

Smaller & Additional Jobs

Notes: Install drainage run, fresh water supply with tap, and electrical conduit duct in the dug channel.

Costs
Costs
Photos

Shorten chimney: fit 90-degree elbow, vent through side of wall housing

Smaller & Additional Jobs
Costs
Costs
Photos

Supply and install pump room entrance lid

Smaller & Additional Jobs

Notes: Sourcing suitable lid. Jose had none in stock. May need to check if hole size needs enlarging.

Costs
Costs
Photos

Remove cable in old flower bed area (concreted over)

Smaller & Additional JobsCustomer
Costs
Costs
Photos

Check pool house cover hole size — may need enlarging

Smaller & Additional JobsCustomer
Costs
Costs
Photos

Remove old electric garden light

Smaller & Additional Jobs

Notes: Part of prep works block

Costs
Costs
Photos

Hot tub install (supplied by MVP) — position, plumb and connect

Smaller & Additional Jobs

Notes: After resin is complete — approx May 5-6

Costs
Costs
Photos

Cap small drain pipes from top to bottom terrace

Groundworks & Drainage

Finish: 27 Mar 2026

Completed: 27 Mar 2026

Costs
Costs
Photos

Reinstate ground after channel installation

Smaller & Additional Jobs

Notes: Backfill and reinstate ground surface after drainage, water and electrical duct installed in channel.

Costs
Costs
Photos

Confirm start date with Fabian for fibreglass prep and lining

Pool Shell Preparation & Refibre

Notes: Fibreglass preparation and lining subcontracted to Fabian. Start date TBC. Cost included in pool respray quote S00973. Confirm schedule before pool is ready for prep.

Costs
Costs
Photos

Fit border tiles around garden area

Wall Rendering & Painting
Costs
Costs
Photos

Trim down bottom step

Terrace Step Tiles

Finish: 12 Mar 2026

Completed: 12 Mar 2026

Costs
Costs
Photos

Remove old tiles from steps

Terrace Step Tiles
Costs
Costs
Photos

Re-render steps in concrete

Terrace Step Tiles
Costs
Costs
Photos

Supply and fit step tiles

Terrace Step TilesDecision needed

Notes: Must be completed after terrace resin. Awaiting tile colour/style decision from customer.

Costs
Costs
Photos

Apply final coat render on garden walls

Wall Rendering & Painting

Notes: First coat applied ~24 Mar 2026. Final coat to follow.

Costs
Costs
Photos

Apply final coat render on garden walls

Wall Rendering & Painting

Notes: First coat applied ~24 Mar 2026. Final coat to follow.

Costs
Costs
Photos

Repair hollow spots in terrace concrete

Smaller & Additional Jobs

Notes: Completed ~27 Mar 2026. Price TBC.

Finish: 27 Mar 2026

Completed: 27 Mar 2026

Costs
Costs
Photos

Apply final coat render on garden walls

Wall Rendering & Painting

Notes: First coat applied ~24 Mar 2026. Final coat to follow.

Costs
Costs
Photos

Repair hollow spots in terrace concrete

Smaller & Additional Jobs

Notes: Completed ~27 Mar 2026. Price TBC.

Finish: 27 Mar 2026

Completed: 27 Mar 2026

Costs
Costs
Photos