Crusty's Pool Refurb

Financials

€49,704.2
Total Quoted (inc tax)
€24,755.2
Paid to Date
€24,949
Outstanding
8
Items TBC

Original Quote€35,300.00 net

S00973Original Quote

Pool Recoating — EcoFinish & Refibre

Recoating the pool with Eco finish in Grey Reef. Sand and prepare the pool for resin coating. Apply three layers of polyester resin. Apply a layer of epoxy coating. Apply three layers of Eco finish coating in GREY REEF.

Product in stock. Pool walls need to be levelled first, then pool prepped and fibreglass applied. Fibre and powder must be after coping stones are laid.

€13,460.00
net
€18,896.20 inc tax
€9,448.00 paid
S01342Original Quote

Pool Pipework Replacement

Changing of pipework in swimming pool. Also run drainage pipes in the trenches for proper drainage.

Pipework complete. Drainage status being evaluated.

€6,200.00
net
€6,634.00 inc tax
€5,307.20 paid
S01227Original Quote

Terrace — Pebbletone/Resin Alpine Granite

1. Removal of existing tiles. 2. Preparing surface with concrete grinder to level and put in falls. 3. Removal of water feature. 4. Sealing terrace with epoxy coating. 5. Application of Pebbletone alpine granite to lower patio area.

€14,400.00
net
€16,734.00 inc tax
€8,000.00 paid
S01227-BOriginal Quote

Border Tiles Around Garden Area

Border tiles around garden area. Remove old tiles and make good.

Removing old ones as part of lifting floor tiles.

€990.00
net
S01227-DOriginal Quote

Shower Installation (labour)

Fitting of shower. Price includes taking feed from garden hose, cutting into wall and making good, making a drain, fitting and plumbing in of shower.

Shower unit to be chosen by customer.

€250.00
net

Changes to Scope€4,200.00 net

S00973-CChange

Coping Stones — Replaces Original Edging Tile Spec (Same Price)

Same cost as the original quote for small edging tiles. With traditional coping stone material, the material costs are cheaper; however, significantly more labour is involved. This quote includes removing the large concrete overhang all the way around the pool to ensure the walls are vertical, levelling the walls and floor to create a proper 90-degree edge for the coping stones to be laid on. Coping stones measured, ordered, delivered and installed.

Replaces S00973-B (original small edging tile spec). Customer agreed change. Same price — material saving offset by additional labour for concrete overhang removal and wall levelling. Coping stones ordered and installed.
€4,200.00
net
S01342-BChange

Pool Pipe Specification Upgrade

Pool pipes changed to upgraded specification from original quote.

Pipes upgraded from original spec. No additional charge to customer.
€0.00
net

Additions€2,000.00 net + 8 TBC

ADD-001Addition

Tile Band — Materials (tiles + epoxy)

Tile Band Tiles and Epoxy - Materials Only - Labour Covered by CD. Quote number to follow.

~€2,000 materials. Installation included — no additional labour charge.

€2,000.00
net
€2,000.00 paid
ADD-002Addition TBC

Hot Tub Electrical Installation

Install electric supply and fuse box for hot tub near heater area.

Awaiting electrician quote
TBC
ADD-003Addition TBC

Pump Room to Heater Channel — Drainage, Water & Electrical Duct

Dig channel from pump room to pool heater enclosure. Install drainage, fresh water supply with tap, and electrical duct. Reinstate ground on completion. Price TBC.

Full price to be confirmed with contractor
TBC
ADD-005Addition TBC

Chimney Modification

Shorten chimney, fit 90-degree elbow, vent through side of wall housing.

TBC
TBC
ADD-006Addition TBC

Gate Painting

Paint gate.

TBC — small job
TBC
ADD-007Addition TBC

Pump Room Lid - Supply and Installation

Supply and installation of new pump room entrance lid. Lid sourced and delivered. Installation price TBC.

Installation price to be confirmed with contractor
TBC
ADD-008Addition TBC

Terrace Step Tiles — Trim, Render and Tile

Trim down bottom step, remove old tiles, re-render steps in concrete, supply and fit new tiles. To be completed after terrace resin.

New addition — terrace steps require full rework: trim, render and tile. Linked to step tile decision.
Price TBC — to be agreed with contractor
TBC
ADD-009Addition TBC

Terrace Concrete Repair

Break out hollow and damaged sections of terrace concrete and replace with new concrete. Work completed ~27 Mar 2026.

Additional work required — hollow spots discovered in terrace concrete during preparation.
Price TBC — to be agreed with contractor
TBC
ADD-009Addition TBC

Terrace Concrete Repair

Break out hollow and damaged sections of terrace concrete and replace with new concrete. Work completed ~27 Mar 2026.

Additional work required — hollow spots discovered in terrace concrete during preparation.
Price TBC — to be agreed with contractor
TBC

Payment History

DateItemAmountNotes
13/03/2026Tile Band — Materials (tiles + epoxy)€2,000.00Tile band tiles and adhesive payment
10/02/2026Terrace — Pebbletone/Resin Alpine Granite€8,000.00~50% deposit on terrace quote S01227
02/12/2025Pool Pipework Replacement€5,307.2080% paid. Balance €1,326.80 outstanding.
25/09/2025Pool Recoating — EcoFinish & Refibre€9,448.0050% deposit paid. Balance €9,448.20 outstanding.
Total Paid€24,755.20